A commercial real estate feasibility study tells you whether a building project can work on a specific site, at a cost your business can carry, before you spend real money on land or design. Most take 4 to 12 weeks and cost about $5,000 to $50,000, and a complex project can pass $100,000.
A good one ends with a plain answer: go, go with changes, or stop. This guide covers what the study should include, what it costs, who does the work, and the questions an owner in Central Minnesota should expect it to answer.
What is a commercial real estate feasibility study?
A feasibility study is the homework you do before you commit to a project. It tests the idea against the site, the city’s rules, the market and your budget, then gives you a go or no-go recommendation.
Most guides on this topic are written for real estate development firms and investors. If you own a business, your question is different. You are not asking whether the project will sell. You are asking whether this building will serve the business, and whether the business can carry it for the next 10 to 20 years.
It also helps to know what a feasibility study is not. A site analysis looks only at the physical and regulatory facts of a property. A feasibility study takes those facts further and asks whether the whole project makes sense. And unlike an appraisal, it is about a building that does not exist yet.
What should a feasibility study tell you before you build?
It should answer 7 questions in writing, each with the evidence behind it. If the report you paid for skips 1 of them, send it back.
| Question | What the study checks | A bad answer looks like |
|---|---|---|
| Can we build it here? | Zoning, permitted use, setbacks, height, parking | The use needs a rezoning that could go either way |
| Will the site take the building? | Survey, soil, wetlands, floodplain, utilities, access | Ground that will not carry the building, or no sewer within reach |
| Is there demand for it? | Market analysis of customers, workers and competing space | The numbers only work in a best case year |
| What will it all cost? | Land, construction, fees, financing and contingency | A cost built from averages, with nothing for surprises |
| Can the business carry it? | Monthly cost against what you pay for space today | The payment only works if sales jump |
| How long will it take? | Approvals, permits, construction season | A schedule with no time for the city |
| What could stop it? | Risks, ranked, with a plan for each | “None found” |
The last row matters most. A feasibility study that finds no risks did not look hard enough.
What are the main parts of a feasibility study?
Most real estate feasibility studies cover 4 areas: market, financial, legal and physical. For an owner, those turn into the 5 sections below.
Market analysis
The market analysis asks who will use the building and what else is nearby. For a clinic or a bank, that means where your customers live and drive. For a production building, it means workers, trucks and highway access. It should also ask what the property would be worth to someone else if your plans change.
Site analysis
The site analysis covers the ground itself. A survey shows the real size and shape of the lot, the easements and where the utilities run. A geotechnical engineer tests the soil. The study should also flag wetlands, floodplain and any environmental history, because cleanup can add months and serious money before construction starts.
Zoning and approvals
Zoning decides what you can build, how tall, how close to the lot lines and how much parking you owe. Building code requirements, such as exits, sprinklers and accessibility, belong here too. The study should say whether your use is allowed outright, needs a conditional use permit or needs a rezoning. Designing to the zoning already in place is almost always faster than asking the city for an exception.
Cost and budget
This section adds up the full development cost, not only the construction contract. Published guides put hard construction costs at 60% to 70% of the total, with design, engineering, permits, legal work and financing making up most of the rest. The budget needs a contingency line. Our guide to what a commercial building costs per square foot covers the ranges by building type.
Schedule
A schedule turns the plan into dates: when the land closes, when the city votes, when you break ground, when you move in. It tells you how long you will pay for 2 locations at once. See our build-to-suit timeline for a month by month view.
How much does a commercial feasibility study cost?
Published ranges run from about $5,000 for a basic screening to $150,000 or more for a study built for lenders and investors. Most studies meant to support a real decision land between $15,000 and $50,000.
| Level of study | Published range | What you get | Best for |
|---|---|---|---|
| Screening | $5,000 to $15,000 | A high level check of the site, the market and rough costs | Sorting ideas before you spend more |
| Standard | $15,000 to $50,000 | Market analysis, financial analysis, risks and a clear recommendation | An owner’s go or no-go decision |
| Lender grade | $50,000 to $150,000 or more | Original research and several cost and income scenarios | A bank or outside investors |
These are published industry figures, not Inventure pricing. Other sources land in the same band: one puts a basic study on a simple site at $5,000 to $10,000 and complex commercial work at $50,000 to $100,000 or more. A common rule of thumb is 0.75% to 3% of the total project cost.
3 things move the price: the size of the project, how much original market research it needs, and who will read the report. Studies for your own decision cost less than those a lender has to rely on. Tell the consultant up front if a bank will see it, because rebuilding a study later costs more than scoping it right the first time.
How long does a feasibility study take?
Plan on 4 to 12 weeks, depending on how complex the project is. A quick screening of a single site can be done faster.
The desk work is rarely what holds things up. The slow parts are the ones that depend on other people: the survey crew, the soil testing, and answers from city staff about zoning and utilities. Order those first.
Who does a feasibility study?
No single trade covers all of it. A full study pulls together several specialists, and someone has to lead them.
- Architect – reads the zoning and tests how big a building fits on the site
- Civil engineer – checks grading, stormwater, access and utilities
- Geotechnical engineer – tests the soil
- Market research or advisory firm – handles the market analysis
- Contractor or estimator – prices the construction
- Lender – tells you what the bank will need to see
- Owner’s representative or development advisor – pulls it into 1 report and 1 recommendation
Who leads matters. An architect is paid to design and a builder is paid to build, so both have a reason to hope the answer is go. The person leading your study should work only for you. That is the idea behind owner’s representation, and it is why the best time to hire an owner’s representative is before design begins.
When should you do a feasibility study?
Do it before you close on the land and before you pay for full design. Those are the 2 points where changing your mind gets expensive.
If you are buying a site, write a due diligence period into the purchase agreement and run the study inside it. That way a bad test result or a zoning problem lets you walk away instead of owning the problem.
If you already own the land, do the study before you hire the full design team. And if you have not picked a site yet, a short screening study on your top 2 or 3 choices is money well spent. Our commercial brokerage team can help you find sites worth testing.
How does a feasibility study work in Central Minnesota?
The parts are the same anywhere, but the local answers are what make or break the budget. In Central Minnesota, 4 items deserve their own lines in the study.
- City approvals – St. Cloud, Sartell, Sauk Rapids, Waite Park and St. Joseph each run their own zoning, planned unit development and conditional use permit steps, on their own meeting calendars
- Water and sewer access charges – cities charge these when a building connects or grows its use, and they belong in the budget from day 1
- Business subsidies – some projects qualify for local help, and the programs come with requirements worth reading early
- The Minnesota construction season – when the approvals land decides whether you break ground in spring or wait through a winter
This is where local experience pays. Doug Boser, our CEO, has been on the construction side of the table since 1989 and the owner’s side since 2000. We know these city halls and the next steps at each one.
What are the red flags in a feasibility study?
The biggest red flag is a study that only works when everything goes right. Watch for these 6.
- The project needs best case sales, the fastest schedule and no contingency to work.
- It depends on a rezoning that could go either way, with no backup plan.
- Construction costs come from averages, with no site testing and no contractor input.
- Environmental or site problems are named but not priced.
- The schedule leaves no room for permits or weather.
- The author gets paid more if you build.
Real projects slip. McKinsey research cited in one of the guides we read found that large construction projects typically finish 20% late and can run up to 80% over budget. A study that does not test for delays and overruns is a sales pitch, not a study.
What happens after the study says go?
A go means you move into design, approvals and bids with a budget and a schedule to hold everyone to. The study becomes the yardstick for every decision after it.
Our guide to the real estate development process walks through each stage that follows. If the study says go with changes, the change is often the way you own or occupy, not the building itself. Our comparison of build-to-suit, buying and leasing covers those paths.
And if the study says stop, it worked. You spent thousands to avoid a mistake that would have cost far more.
How does Inventure help owners decide before they build?
We built Inventure BLUEPRINT for owners who are not yet sure a new building is the answer. It puts your real options side by side, from staying and improving your current space to expanding, relocating, leasing or owning, so you can see the cost, the schedule and the tradeoffs of each before you commit.
Because brokerage, real estate development, owner’s representation and property management sit under 1 roof in downtown St. Cloud, the people who test your project are the same people who know what it takes to build and run it. You can see the kinds of buildings we have worked on at our projects page.
Thinking about a new building, an expansion or a move? Talk with us about your building or call (320) 980-2300.
Frequently Asked Questions
A financial feasibility study tests whether the money works. It adds up the full cost of the project, compares it with what the building will earn or save, and checks whether you can fund it. For a business owner, it comes down to whether the monthly cost fits the business.
The 4 forms most often listed are technical, legal, operational and scheduling feasibility. Real estate guides usually group them a little differently, as market, financial, legal and physical. Either way, the study has to cover the site, the rules, the money and the time.
For a commercial property, the 5 components are a market analysis, a financial analysis, a site and technical review, a legal and approvals review, and a cost and schedule estimate. A good report ends with a recommendation that ties all 5 together.
A feasibility period is a set number of days in a purchase agreement when the buyer can inspect the property and back out. It is also called a due diligence period. Buyers use it to run the survey, site and zoning checks before the deal becomes firm.
Real estate is commercial when it is used for business instead of as a home. Offices, clinics, banks, stores, warehouses and production buildings all count. Local zoning sets which commercial uses are allowed on each piece of land.
No. Due diligence checks a property you are about to buy. A feasibility study checks the project you plan to put on it. They overlap, and the best time to run the study is during the due diligence period.